This massive 750,000L modular stormwater detention tank at “The Oaks” Estate at Poowong must be one of the largest tanks built in recent times. The 1300 no. Ellipse penta modules were assembled over a two week period and rapidly moved into position using a forklift.
Note the flush path at the base of the tank, allowing easy flush-out of the tank. Just another day at the office for contractor South Gippsland Quarries. Southern Geosynthetics has supplied modular stormwater systems for over 20 years and can assist with any design or pricing questions. And with new cost saving iglube modules about to be introduced our motto of “A Better Way” has become “There is Always a Better Way.
Administration Queries
Wayne Alexander - Manager