DUX 600c at Maribrynong River

DUX 600c at Maribrynong River

Super tough DUX 600c handles the roughest treatment

Have a look at the torture that DUX 600c heavy-weight non-woven geotextile puts up with during installation of large 1.0m diameter toe rock along the Maribyrnong River at Footscray. Part of $12M refurbishment work including construction of timber boardwalk. Expert installation by Simpson Constructions.

Ellipse And STM Modules Chambers
Partners & Supporters
brand-dux
brand-cipatex
brand-ellipse
brand-iglube
brand-roadtape
brand-roadgrid
brand-iglube
brand-roadtape